App Overview

Power Apps Mobile Preview icon

Power Apps Mobile Preview

Microsoft Corporation · Developer Tools

Test your in-development Power Apps mobile experiences on a real device — no rebuild, no resign, no store submission

Free · In-app purchases

PRICE
Free
In-app purchases
BUSINESS MODEL
Freemium
No overall Grossing estimate available
RATING
N/A
No ratings yet

Evidence scope: No current overall US chart position is available. Category-chart positions shown in discovery are a separate scope. Revenue is a directional model estimate, not verified earnings.

Build your own version

Build Kit

Make this idea yours

A product spec, screen plans, and build steps for your coding agent.

First kit free with a verified email

Add to a Remix

Combine features and design from your favorite apps.

Kit ready. Verify your email to download it.

What's included16 files

A product spec, phased build plan, differentiation notes, and screen references.

  • START_HERE
  • AGENTS
  • EVIDENCE
  • SPEC
  • BUILD_PLAN
  • DIFFERENTIATION
  • skills/
  • screens/
Preview a sample Build Kit No email needed

Illustrative example: an invoice app for independent contractors. Your kit is tailored to the app you choose; this is not its generated content.

Feature spec

Goal: Send a clear invoice after finishing a job.

  • Add a client, line items, a due date, and payment instructions.
  • Preview the total before exporting a PDF.
  • Keep an editable draft if export fails.

Screen plan

Invoice editor: Client at the top, editable line items in the middle, total and preview action at the bottom.

States: Empty draft, validation errors beside each field, exporting, and a retry action that preserves the draft.

Differentiate and validate

Hypothesis: Contractors need faster repeat invoices more than more templates.

First experiment: Test duplicating a previous job with five contractors. Watch where they hesitate before expanding the feature set.

The full kit adds a phased build plan, evidence notes, tool prompts, and implementation guidance. It is a plan for your coding agent, not a finished app.

Usage: Mechanics are fair game; never reuse the original name, branding, assets, or verbatim copy.

JavaScript is required to complete mailbox verification.

Free quick prompt For a smaller starting point

Quick prompt

> SELECT BUILD PLATFORM:

Good fit for mobile-first iOS and Android prototypes with managed app scaffolding.

// RORK SYSTEM PROMPT
Rork plan preview for Power Apps Mobile Preview: map the core Developer Tools workflow, choose the smallest differentiated feature set, define the data and monetization boundaries, then prototype the riskiest user journey first.
            

Preview ready. Verify your email to reveal and copy the full prompt.

JavaScript is required to complete mailbox verification. Return to this prompt preview.

Continue in Rork copies the full prompt to your clipboard first, then opens Rork in a new tab.

Continue in Rork >

Affiliate link: CloneChart may earn a commission at no extra cost

Opportunities

AI-GENERATED OPPORTUNITY HYPOTHESES

These are generated suggestions, not verified review quotations. Check current App Store reviews and speak with users before treating a possible gap as a requirement.

Hypothesis 1

Allow more flexibility in app design and component integration.

Assumption to check: Limited customization options compared to traditional coding

Validate with people who use this workflow before building.

Hypothesis 2

Implement a cleaner, more organized layout.

Assumption to check: User interface may feel cluttered

Validate with people who use this workflow before building.

Hypothesis 3

Provide better onboarding tutorials and step-by-step guides.

Assumption to check: Steep learning curve for non-developers

Validate with people who use this workflow before building.

Hypothesis 4

Optimize the app for smoother performance and faster load times.

Assumption to check: Performance issues with complex apps

Validate with people who use this workflow before building.

App evidence

Original App Store material. Ratings and screenshots describe the existing app, not proof of demand for your version.

App Store description

Test your in-development Power Apps mobile experiences on a real device — no rebuild, no resign, no store submission. Power Apps Mobile Preview app is a developer companion app for the new React Native–based Power Apps mobile runtime: scan a QR code from your local Metro bundler (or paste a dev URL) and your app loads instantly on your phone or tablet, exactly the way it will run in production. Think of it as the Power Apps equivalent of a dev sandbox. Built for makers and engineers iterating on the next generation of Power Apps mobile. WHAT'S INSIDE Power Apps Mobile Preview is a thin host that loads your in-progress app bundles over the wire so you can see code, layout, and data changes in seconds. • Scan-to-load: Point the in-app scanner at the QR code printed by your local Metro / Expo dev server and the JS bundle streams onto the device. • Manual URL entry: Type or paste any reachable dev-server URL (e.g., http://192.168.1.20:8081) when QR scanning isn't an option — tunnels, remote machines, restricted networks. • Fast Refresh: Save a file in your editor and watch the change appear on device, with component state preserved where possible. • Native module parity: Bundled with the same native modules the production Power Apps client ships — auth, connectors, file system, camera, location, secure storage, telemetry — so what you test is what your users will get. • Sign-in with your work or school account: Authenticate once with Microsoft Entra and your dev apps can call Dataverse, Microsoft Graph, and custom connectors with real tokens. • Recent connections list: Quickly re-open previously loaded dev URLs without re-scanning. • Diagnostic overlay: Surface bundle URL, runtime version, JS errors, and red-box stacks for fast triage. WHO IT'S FOR • Makers previewing custom React Native components and pages before publishing. • ISVs and partners building native extensions against the Power Apps mobile runtime. • Engineers on the Power Apps platform team validating SDK and connector changes end-to-end on real hardware. TIPS • Make sure your phone and dev machine are on the same Wi-Fi network — if they aren't, use a tunnel (e.g., expo start --tunnel) and paste the public URL. • Shake the device (or use the menu) to reload the bundle, toggle the element inspector, or open the dev menu. • Long-press a recent connection to remove it from the list. • Mobile Preview app is for development only. You will need to package and distribute your own production apps to App Store or enterprise distribution channel. DISCLAIMER This is a developer only release intended for development and evaluation. APIs, behaviors, and supported native modules may change before general availability. Do not rely on Mobile Preview app for production workloads. Accessibility: https://go.microsoft.com/fwlink/?linkid=2121429

Written user reviews are not shown here. Check current App Store reviews >

Screenshots

< Scroll to see more >

Build scope

Plan a focused first version with your coding agent. These are planning assumptions, not a delivery guarantee.

Define the first version

Choose one audience and one core workflow. Use the kit to agree on its screens, data, and acceptance criteria before building.

Set boundaries

Decide which secondary features, integrations, and platform support can wait. Your version does not need to reproduce everything in the original.

Check the hard parts

Validate external services, specialist technology, data access, and ongoing costs for your chosen scope.

SUGGESTED BUILD STACK
React Native
Expo
TypeScript
Redux
React Navigation
Firebase
BUILD KIT DIFFICULTY
Advanced

From the Build Kit assessment.

A reliable timeline needs an agreed scope and a technical check. Ask your agent to estimate the phases in BUILD_PLAN.md after that review.