Feature spec
Goal: Send a clear invoice after finishing a job.
- Add a client, line items, a due date, and payment instructions.
- Preview the total before exporting a PDF.
- Keep an editable draft if export fails.
Manage your Netlify sites and much more
Free · In-app purchases
Evidence scope: No current overall US chart position is available. Category-chart positions shown in discovery are a separate scope. Revenue is a directional model estimate, not verified earnings.
A product spec, screen plans, and build steps for your coding agent.
First kit free with a verified email
Combine features and design from your favorite apps.
Kit ready. Verify your email to download it.
Generating… usually about a minute.
What should your app do differently? Your note travels with the kit so your coding agent builds around your idea.
A product spec, phased build plan, differentiation notes, and screen references.
Illustrative example: an invoice app for independent contractors. Your kit is tailored to the app you choose; this is not its generated content.
Goal: Send a clear invoice after finishing a job.
Invoice editor: Client at the top, editable line items in the middle, total and preview action at the bottom.
States: Empty draft, validation errors beside each field, exporting, and a retry action that preserves the draft.
Hypothesis: Contractors need faster repeat invoices more than more templates.
First experiment: Test duplicating a previous job with five contractors. Watch where they hesitate before expanding the feature set.
The full kit adds a phased build plan, evidence notes, tool prompts, and implementation guidance. It is a plan for your coding agent, not a finished app.
Usage: Mechanics are fair game; never reuse the original name, branding, assets, or verbatim copy.
JavaScript is required to complete mailbox verification.
Good fit for mobile-first iOS and Android prototypes with managed app scaffolding.
Rork plan preview for Dashify for Netlify.com: map the core Developer Tools workflow, choose the smallest differentiated feature set, define the data and monetization boundaries, then prototype the riskiest user journey first.
Preview ready. Verify your email to reveal and copy the full prompt.
JavaScript is required to complete mailbox verification. Return to this prompt preview.
Affiliate link: CloneChart may earn a commission at no extra cost
These are generated suggestions, not verified review quotations. Check current App Store reviews and speak with users before treating a possible gap as a requirement.
Hypothesis 1
Assumption to check: Limited customization options for site management.
Validate with people who use this workflow before building.
Hypothesis 2
Assumption to check: Lack of detailed analytics and insights.
Validate with people who use this workflow before building.
Hypothesis 3
Assumption to check: Inconsistent performance on lower-end devices.
Validate with people who use this workflow before building.
Hypothesis 4
Assumption to check: No offline access to site data.
Validate with people who use this workflow before building.
Original App Store material. Ratings and screenshots describe the existing app, not proof of demand for your version.
Manage your Netlify sites and much more. Take Netlify anywhere you go with Dashify! ◆ SITES - Most Recent Sites at a glance - Browse All Sites on your team(s) ◆ DEPLOYMENTS - Deployment Summary in the same format same as Netlify - Preview Image for each Deployment - Check the Output files - Link for Deploymen ◆ FORMS - Browse all of your Forms - Submissions for each Form ◆ LOGS - Build Logs in real time - Function & Edge Function Logs for any Site - Expand Log Details ◆ DOMAINS - Custom domains assigned to each Site That’s it folks! This text isn't gonna get any more interesting. I mean, I think we've pretty much covered all the good stuff. Still here? Ummmm, ok. How's everything? Good? Cool cool cool. What are you looking for? The app description is over. For real, check out the app. It's way better than hanging out in the App Store this long. Wow, you're dedicated. Do you just love app descriptions? Weird. OK, we're gonna go now. Bye. NOTICE & ACKNOWLEDGMENT 1. API tokens are stored locally on your device, and never leave it. 2. Dashify is OSS (Open Source Software), feel free to open an Issue or PR at github.com/get-dashify/dashify 3. This is not a replacement for the Vercel website. Certain actions, such as creating new projects, should be done directly in the web dashboard. © FarFetched 2025. All trademarks and copyrights belong to their respective owners. Terms of Service: https://farfetched.global/dashify/terms
Written user reviews are not shown here. Check current App Store reviews >
Plan a focused first version with your coding agent. These are planning assumptions, not a delivery guarantee.
Choose one audience and one core workflow. Use the kit to agree on its screens, data, and acceptance criteria before building.
Decide which secondary features, integrations, and platform support can wait. Your version does not need to reproduce everything in the original.
Validate external services, specialist technology, data access, and ongoing costs for your chosen scope.
From the Build Kit assessment.
A reliable timeline needs an agreed scope and a technical check. Ask your agent to estimate the phases in BUILD_PLAN.md after that review.