App Overview

Hazmat Load  Segregation Guide icon

Hazmat Load Segregation Guide

ThatsMyStapler Inc. · Reference

Easy-to-review version of the "Segregation for Hazardous Materials" tables found in CFR 49 §177.848

$0.99 · In-app purchases

PRICE
$0.99
In-app purchases
BUSINESS MODEL
Paid
No overall Grossing estimate available
RATING
4.7
525 ratings · Top 15%

Evidence scope: No current overall US chart position is available. Category-chart positions shown in discovery are a separate scope. Revenue is a directional model estimate, not verified earnings.

Build your own version

Build Kit

Make this idea yours

A product spec, screen plans, and build steps for your coding agent.

First kit free with a verified email

Add to a Remix

Combine features and design from your favorite apps.

Kit ready. Verify your email to download it.

What's included16 files

A product spec, phased build plan, differentiation notes, and screen references.

  • START_HERE
  • AGENTS
  • EVIDENCE
  • SPEC
  • BUILD_PLAN
  • DIFFERENTIATION
  • skills/
  • screens/
Preview a sample Build Kit No email needed

Illustrative example: an invoice app for independent contractors. Your kit is tailored to the app you choose; this is not its generated content.

Feature spec

Goal: Send a clear invoice after finishing a job.

  • Add a client, line items, a due date, and payment instructions.
  • Preview the total before exporting a PDF.
  • Keep an editable draft if export fails.

Screen plan

Invoice editor: Client at the top, editable line items in the middle, total and preview action at the bottom.

States: Empty draft, validation errors beside each field, exporting, and a retry action that preserves the draft.

Differentiate and validate

Hypothesis: Contractors need faster repeat invoices more than more templates.

First experiment: Test duplicating a previous job with five contractors. Watch where they hesitate before expanding the feature set.

The full kit adds a phased build plan, evidence notes, tool prompts, and implementation guidance. It is a plan for your coding agent, not a finished app.

Usage: Mechanics are fair game; never reuse the original name, branding, assets, or verbatim copy.

JavaScript is required to complete mailbox verification.

Free quick prompt For a smaller starting point

Quick prompt

> SELECT BUILD PLATFORM:

Good fit for mobile-first iOS and Android prototypes with managed app scaffolding.

// RORK SYSTEM PROMPT
Rork plan preview for Hazmat Load Segregation Guide: map the core Reference workflow, choose the smallest differentiated feature set, define the data and monetization boundaries, then prototype the riskiest user journey first.
            

Preview ready. Verify your email to reveal and copy the full prompt.

JavaScript is required to complete mailbox verification. Return to this prompt preview.

Continue in Rork copies the full prompt to your clipboard first, then opens Rork in a new tab.

Continue in Rork >

Affiliate link: CloneChart may earn a commission at no extra cost

Opportunities

AI-GENERATED OPPORTUNITY HYPOTHESES

These are generated suggestions, not verified review quotations. Check current App Store reviews and speak with users before treating a possible gap as a requirement.

Hypothesis 1

Provide more comprehensive guides and resources for users.

Assumption to check: Limited information on some hazardous materials

Validate with people who use this workflow before building.

Hypothesis 2

Implement offline storage for quicker access.

Assumption to check: No offline access to guides

Validate with people who use this workflow before building.

Hypothesis 3

Simplify navigation and improve UI layout.

Assumption to check: User interface can be cluttered

Validate with people who use this workflow before building.

Hypothesis 4

Clarify subscription options and benefits to enhance user understanding.

Assumption to check: In-app purchases can be confusing

Validate with people who use this workflow before building.

App evidence

Original App Store material. Ratings and screenshots describe the existing app, not proof of demand for your version.

App Store description

Easy-to-review version of the "Segregation for Hazardous Materials" tables found in CFR 49 §177.848 This app utilizes the "Segregation for Hazardous Materials" and "Class 1 Explosives Compatibility" Tables found in DOT/PHMSA Hazmat and IATA Dangerous Goods (DG) Handling Regulations. Because of their hazards, some hazardous materials may not be loaded, transported, sorted or stored together during the course of transportation. In other cases, the materials may loaded/shipped together as long as they are separated so that if any of the packages leak during transport, the leaked material would not commingle with other hazardous materials. Using the "Segregation Tables" in the D.O.T's Hazardous Materials or IATA's Dangerous Goods Handling Regulations, employees determine the requirements for loading/shipping different classes of hazardous materials on the same vehicle or aircraft. The information presented in this app can help the hazmat employee training requirements by supplementing knowledge with a quick and easy to use interface. Includes Source Material References : - IATA DG Handling Information Pamphlet - DOT CFR49 - § 177.848 Hazmat Regulations

Written user reviews are not shown here. Check current App Store reviews >

Screenshots

< Scroll to see more >

Build scope

Plan a focused first version with your coding agent. These are planning assumptions, not a delivery guarantee.

Define the first version

Choose one audience and one core workflow. Use the kit to agree on its screens, data, and acceptance criteria before building.

Set boundaries

Decide which secondary features, integrations, and platform support can wait. Your version does not need to reproduce everything in the original.

Check the hard parts

Validate external services, specialist technology, data access, and ongoing costs for your chosen scope.

SUGGESTED BUILD STACK
React Native
Expo
Supabase
Zustand
React Navigation
TypeScript
BUILD KIT DIFFICULTY
Starter

From the Build Kit assessment.

A reliable timeline needs an agreed scope and a technical check. Ask your agent to estimate the phases in BUILD_PLAN.md after that review.