Feature spec
Goal: Send a clear invoice after finishing a job.
- Add a client, line items, a due date, and payment instructions.
- Preview the total before exporting a PDF.
- Keep an editable draft if export fails.
tool to support the calculation of electrical installations that will allow the user (designer/electrician/technician) to perform electrical calculations easily and quickly.
$4.99 · In-app purchases
Evidence scope: No current overall US chart position is available. Category-chart positions shown in discovery are a separate scope. Revenue is a directional model estimate, not verified earnings.
A product spec, screen plans, and build steps for your coding agent.
First kit free with a verified email
Combine features and design from your favorite apps.
Kit ready. Verify your email to download it.
Generating… usually about a minute.
What should your app do differently? Your note travels with the kit so your coding agent builds around your idea.
A product spec, phased build plan, differentiation notes, and screen references.
Illustrative example: an invoice app for independent contractors. Your kit is tailored to the app you choose; this is not its generated content.
Goal: Send a clear invoice after finishing a job.
Invoice editor: Client at the top, editable line items in the middle, total and preview action at the bottom.
States: Empty draft, validation errors beside each field, exporting, and a retry action that preserves the draft.
Hypothesis: Contractors need faster repeat invoices more than more templates.
First experiment: Test duplicating a previous job with five contractors. Watch where they hesitate before expanding the feature set.
The full kit adds a phased build plan, evidence notes, tool prompts, and implementation guidance. It is a plan for your coding agent, not a finished app.
Usage: Mechanics are fair game; never reuse the original name, branding, assets, or verbatim copy.
JavaScript is required to complete mailbox verification.
Good fit for mobile-first iOS and Android prototypes with managed app scaffolding.
Rork plan preview for InstElectric Pro - Electricity: map the core Productivity workflow, choose the smallest differentiated feature set, define the data and monetization boundaries, then prototype the riskiest user journey first.
Preview ready. Verify your email to reveal and copy the full prompt.
JavaScript is required to complete mailbox verification. Return to this prompt preview.
Affiliate link: CloneChart may earn a commission at no extra cost
These are generated suggestions, not verified review quotations. Check current App Store reviews and speak with users before treating a possible gap as a requirement.
Hypothesis 1
Assumption to check: Limited functionality compared to competitors
Validate with people who use this workflow before building.
Hypothesis 2
Assumption to check: Poor user reviews indicate usability issues
Validate with people who use this workflow before building.
Hypothesis 3
Assumption to check: Lack of cloud synchronization
Validate with people who use this workflow before building.
Hypothesis 4
Assumption to check: No recurring billing features
Validate with people who use this workflow before building.
Original App Store material. Ratings and screenshots describe the existing app, not proof of demand for your version.
tool to support the calculation of electrical installations that will allow the user (designer/electrician/technician) to perform electrical calculations easily and quickly. · dimensioning complete of low voltage circuits with the most frequent installation methods · phase cable size, neutral, protective conductor · criteria based on the admissible current of the cable, voltage drop and overcurrent protection · designation of the most used cables. · circuits with automatic circuit breaker until in=4000 a (ir rating setting), maximum fuse in=1600 a (gg type), maximum 12 conductors parallel per phase, maximum size 630 mm² · short-circuits, including mv network, lv lines and final circuit · estimate of the maximum short-circuit current (simplified method) · maximum protected length for minimum short circuit (approximate method) · earthing system with diferentes types of electrodes (rods, buried conductor, rings and grid) · distance between the earthing systems · forecast of loads of a building destined to houses with several sections: dwellings, common services, commercial premises/offices and garage with/without infrastructure for recharging electric vehicles · reactive power of the capacitor bank for the compensation of the power factor (cos φ) and capacity (µf) of the capacitors · c/k factor for automatic capacitor bank · frequency resonance capacitors · compensation of the power factor for a three-phase transformer · choice of installation system in the function of the circuit, cable and its situation · overvoltage due to defects to earth in medium voltage mv depending on the earthing systems · power in an unbalanced three-phase system · overvoltages due to loss of neutral conductor, earth fault and short circuit · electricity parameters of a single-phase or three-phase (balanced) · transformer performance · secondary voltage of a transformer acoording to switch position · distribution of load of transformers in parallel · k-factor transformer · current transformer · verification resistance of the assembly to short-circuits · dissipated power of a assembly · size of trays and conduits · conduits characteristics according to the installation method · conversions of wire sizes (mm²-awg) and conduits threads · impedance, resistance and reactance of a cable · representation of the curves of the protections · international protection ip - ik parameter settings for calculations: · constants (voltages, conductivity, temperatures, etc.) that affect electrical calculations · protections (circuit breakers and fuses) · selection of minimum rate for circuit-breakers with regulation and maximum cable size for multi-conductor grouping per phase · method estimation of the reactance · conductivity of the conductor depending on the current of the circuit (constant, according to the expected current, maximum cable temperature) · use reduction factors by grouping cables/circuits · use of factors of diversity/utilization · reference documents: iec standards, rebt (sp), technical application guide, (ue) 2016/364 in no case shall the author be liable for any direct or indirect damages as a result of the correct or incorrect use of the application
Written user reviews are not shown here. Check current App Store reviews >
Plan a focused first version with your coding agent. These are planning assumptions, not a delivery guarantee.
Choose one audience and one core workflow. Use the kit to agree on its screens, data, and acceptance criteria before building.
Decide which secondary features, integrations, and platform support can wait. Your version does not need to reproduce everything in the original.
Validate external services, specialist technology, data access, and ongoing costs for your chosen scope.
From the Build Kit assessment.
A reliable timeline needs an agreed scope and a technical check. Ask your agent to estimate the phases in BUILD_PLAN.md after that review.