App Overview

Mobile Electrician icon

Mobile Electrician

Anatolij Tarasenko · Productivity

Basic electrical calculations on your mobile

$4.99

PRICE
$4.99
No in-app purchases
BUSINESS MODEL
Paid
No overall Grossing estimate available
RATING
2.6
5 ratings · Below Average

Evidence scope: No current overall US chart position is available. Category-chart positions shown in discovery are a separate scope. Revenue is a directional model estimate, not verified earnings.

Build your own version

Build Kit

Make this idea yours

A product spec, screen plans, and build steps for your coding agent.

First kit free with a verified email

Add to a Remix

Combine features and design from your favorite apps.

Kit ready. Verify your email to download it.

What's included16 files

A product spec, phased build plan, differentiation notes, and screen references.

  • START_HERE
  • AGENTS
  • EVIDENCE
  • SPEC
  • BUILD_PLAN
  • DIFFERENTIATION
  • skills/
  • screens/
Preview a sample Build Kit No email needed

Illustrative example: an invoice app for independent contractors. Your kit is tailored to the app you choose; this is not its generated content.

Feature spec

Goal: Send a clear invoice after finishing a job.

  • Add a client, line items, a due date, and payment instructions.
  • Preview the total before exporting a PDF.
  • Keep an editable draft if export fails.

Screen plan

Invoice editor: Client at the top, editable line items in the middle, total and preview action at the bottom.

States: Empty draft, validation errors beside each field, exporting, and a retry action that preserves the draft.

Differentiate and validate

Hypothesis: Contractors need faster repeat invoices more than more templates.

First experiment: Test duplicating a previous job with five contractors. Watch where they hesitate before expanding the feature set.

The full kit adds a phased build plan, evidence notes, tool prompts, and implementation guidance. It is a plan for your coding agent, not a finished app.

Usage: Mechanics are fair game; never reuse the original name, branding, assets, or verbatim copy.

JavaScript is required to complete mailbox verification.

Free quick prompt For a smaller starting point

Quick prompt

> SELECT BUILD PLATFORM:

Good fit for mobile-first iOS and Android prototypes with managed app scaffolding.

// RORK SYSTEM PROMPT
Rork plan preview for Mobile Electrician: map the core Productivity workflow, choose the smallest differentiated feature set, define the data and monetization boundaries, then prototype the riskiest user journey first.
            

Preview ready. Verify your email to reveal and copy the full prompt.

JavaScript is required to complete mailbox verification. Return to this prompt preview.

Continue in Rork copies the full prompt to your clipboard first, then opens Rork in a new tab.

Continue in Rork >

Affiliate link: CloneChart may earn a commission at no extra cost

Opportunities

AI-GENERATED OPPORTUNITY HYPOTHESES

These are generated suggestions, not verified review quotations. Check current App Store reviews and speak with users before treating a possible gap as a requirement.

Hypothesis 1

Full offline with background sync

Assumption to check: No offline mode

Validate with people who use this workflow before building.

Hypothesis 2

Real-time sync with conflict resolution UI

Assumption to check: Sync issues

Validate with people who use this workflow before building.

Hypothesis 3

Minimal design, progressive feature disclosure

Assumption to check: Feature bloat

Validate with people who use this workflow before building.

App evidence

Original App Store material. Ratings and screenshots describe the existing app, not proof of demand for your version.

App Store description

Basic electrical calculations on your mobile Mobile Electrician is a simple and powerful collection of electrical tools. It helps to save both time and effort while providing accurate results to various calculations. With this app you always have all important information at hand! The app includes: Basics: Ohm's law for DC Ohm's law for AC LC Resonance Y-Δ Transformation Electrical Energy Current Density Ideal transformer AC circuits RC snubbers Capacity: Connection of capacitors Capacitive reactance Run a 3 phase motor on a single phase Capacitive Voltage Divider Capacitor Charge / Energy Calculator Decode alphanumeric value Encode alphanumeric value Capacitor to reduce voltage Calculation of discharge time of capacitors Capacitor reactive power Resistance: Connection of resistors Voltage divider LED Resistor Decode the color bands resistors Encode the color bands resistors Wheatstone Bridge Calculator Decode alphanumeric value Encode alphanumeric value Standard Resistor Value Inductance: Connection of inductors Wire Self Inductance Inductive reactance Inductive Voltage Divider Decode the color bands inductors Inductance of an air core inductor Inductance of a solenoid Conductor: Conductor Resistance Conductor length Conductor size Voltage drop Electrical resistivity and conductivity Maximum length of conductor Motor: Calculate Amps Calculate Power Calculate kVA (3 Phase) Calculate Power Factor(3 Phase) Calculate efficiency Calculate of the motor slip Calculate motor torque Individual compensation three-phase induction motors Calculate motor power for centrifugal pump Calculate motor power for piston compressor Calculate motor power for the fan Three-Phase Motor Voltage Unbalance Three-Phase Motor Current Unbalance Motor Protection Standards: Allowable ampacities for wire (NEC,IEC,CEC,PUE,IET,AS/NZS) Wire Size Calculator(NEC,IEC,CEC,PUE,IET,AS/NZS) Motor protection(PUE) Maximum circuit conductor length(NEC,IEC,CEC,PUE,IET,AS/NZS) Maximum circuit ampacity(NEC,IEC,CEC,PUE,IET,AS/NZS) Conduit Fill Calculator(NEC) Others: Minimum levels of short-circuit current Short-circuit current at the secondary terminals of a MV/LV distribution transformer Calculate fuse Power of heating element Heating Element use Nichrome Leakage current Calculation sizing a generator for your home IP Code Appliance classes Force of an Electromagnet Electricity Cost Calculator Calculation of electrical loads applying demand factor UPS Battery size calculator UPS Battery runtime calculator Calculation of transformer rating Generator short circuit fault current Calculation of earthing conductors Compensation to increase the available active power of the transformer Conversion: Conversion Wire sizes Conversion VA-W-VAr and calculate Reactive Power Compensation Conversion cos(φ)-sin(φ)-tg(φ) AWG Conversions Conversion of units of temperature Conversion distance Conversion units of pressure Conversion units of flow Conversion units of volume Conversion voltage Conversion units of energy Conversion SI prefixes Conversion Weight Time Units Conversion Power Units Conversion Cables: Calculate number cables that fits in a pipe Cable Reel Capacity Length of cable on a reel Inductive reactance cable Calculate the weight of the metal in the cable Cable weight by formulas Wiring Color Codes Length of a Hanging Cable Power losses in cable Sizing of protective earthing conductor For each calculation is given a separate help Mathematical calculator Percentage calculator Time calculator Online and offline handbook Making reports and screenshots. Save, print and send

Written user reviews are not shown here. Check current App Store reviews >

Screenshots

< Scroll to see more >

Build scope

Plan a focused first version with your coding agent. These are planning assumptions, not a delivery guarantee.

Define the first version

Choose one audience and one core workflow. Use the kit to agree on its screens, data, and acceptance criteria before building.

Set boundaries

Decide which secondary features, integrations, and platform support can wait. Your version does not need to reproduce everything in the original.

Check the hard parts

Validate external services, specialist technology, data access, and ongoing costs for your chosen scope.

SUGGESTED BUILD STACK
React Native
Supabase
Expo
RevenueCat
BUILD KIT DIFFICULTY
Intermediate

From the Build Kit assessment.

A reliable timeline needs an agreed scope and a technical check. Ask your agent to estimate the phases in BUILD_PLAN.md after that review.